Service and software
Handling, assembly and shipping for PixioCard
Map out packing, filling, addressing, storage and shipping as separate project components, with a controlled calculation per print run and destination.

After production, a PixioCard or PixioBox project may require additional actions, such as separate packaging, adding a product or accompanying card, preparing for dispatch, labelling or sending directly to recipients. Which steps are needed depends on product direction, print run, content, packaging and the desired receiving experience.
Before calculating, establish who supplies materials and address details, how files are checked, which assembly steps apply and whether temporary storage is needed. For shipping to individual recipients, agreements are also required on data transfer, retention period, returns, international destinations and responsibilities in the chain.
Rates, packaging materials, carrier, lead time and country coverage are confirmed per current project. The quotation shows production, handling, storage and shipping separately, so an old fixed approach or price is not automatically carried over and the implementation plan can be checked before start.